Close Menu
    Track all markets on TradingView
    Facebook X (Twitter) Instagram
    • Privacy Policy
    • Term And Conditions
    • Disclaimer
    • About us
    • Contact us
    Facebook X (Twitter) Instagram
    WSJ-Crypto
    • Home
    • Bitcoin
    • Ethereum
    • Blockchain
    • Crypto Mining
    • Economy and markets
    WSJ-Crypto
    Home » EVOSS Reinstates Contract Processing: An Update from the Department of Energy
    Economy and markets

    EVOSS Reinstates Contract Processing: An Update from the Department of Energy

    wsjcryptoBy wsjcrypto19 Novembre 2024Nessun commento2 Mins Read
    Share
    Facebook Twitter LinkedIn Pinterest Email

    THE Department of Energy (DoE) announced it will commence accepting applications for renewable energy (RE) agreements via the Energy Virtual One-Stop Shop (EVOSS) System starting next week, following the removal of a five-month halt.

    As of Nov. 25, RE developers will have the opportunity to present their formal letters of intent and requests for RE agreements through EVOSS, the DoE stated in a report on Tuesday.

    “This resumption signifies a crucial advancement in progressing the nation’s renewable energy objectives, promoting more effective project approvals while ensuring that forthcoming initiatives are in accordance with the updated regulatory framework,” Energy Undersecretary Rowena Cristina L. Guevara commented.

    Ms. Guevara is optimistic about “increased investment and growth in the renewable energy sector” following the enhancements, aiding in the aim of boosting the proportion of RE within the power generation mix.

    The processing of RE applications through the EVOSS System was paused on June 25 to enable the DoE to refine the application procedure, aligning it with the revised omnibus regulations governing RE agreements published on June 10.

    Additionally, the DoE has modified the procedure for developers to acquire a certificate of authority (CoA) prior to signing a renewable energy agreement. This change permits developers to initiate permit processing, perform surveys, and undertake pre-feasibility activities before the formal 25-year agreement period commences.

    “Through the integration of CoA in the EVOSS application process and a clearer roster of registered renewable energy project developers, we can now oversee projects more efficiently,” Ms. Guevara stated.

    “This will promote a more vibrant and competitive landscape, encouraging innovation and efficiency, while guaranteeing that the energy transition is spearheaded by committed and capable developers,” she added. — Sheldeen Joy Talavera



    Source link

    return a list of comma separated tags from this title: RE contract processing via EVOSS resumes — DoE
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    wsjcrypto

    Related Posts

    “NYT’s Take on Sacks’ Conflicts: Just a Bunch of Hot Air”

    1 Dicembre 2025

    Hotel101 Unveils 429-Room Condotel in Milan – Its Second Spot in Europe!

    30 Novembre 2025

    SEC Commissioner Hester Peirce Stunned by Ongoing Debate Over Self-Custody

    30 Novembre 2025

    Ex-DPWH Engineer Henry Alcantara Donates P110 Million to the Nation’s Fund!

    30 Novembre 2025
    Add A Comment

    Comments are closed.

    Top Posts

    Subscribe to Updates

    Get the latest sports news from SportsSite about soccer, football and tennis.

    Top Coins
    # Name Price Changes 24h Market CAPVolumeSupply
    WSJ-Crypto
    Facebook X (Twitter) Instagram Pinterest
    • Privacy Policy
    • Term And Conditions
    • Disclaimer
    • About us
    • Contact us
    ©Copyright 2025 . Designed by WSJ-Crypto

    Type above and press Enter to search. Press Esc to cancel.

    Go to mobile version